Batching Plant
Product Detailed
Three Gorges Hydropower Station
Features:
1. Stability and Durability: adapt and apply the most advanced technologies around
The company has supplied hundreds of pre-cooling and/or ordinary batching tower (plant) with the capacity of 90--400m³/h to hydroelectric station projects at home and abroad, such as Three Gorges, Xiluodu, Xiangjiaba, Xiaowan, Tingzikou, Muro, Ghana etc. as the reliable assurance to make these national key projects to be completed in time in high quality. The company’s large size of concrete batching tower (plant) holds the dominant position in the hydroelectric market in china with market share over 75%.
Other products